Office Fit-Out for Parque Arauco in Santiago — 4,102 m²
Portfolio

Parque Arauco

Office Fit-Out · 4,102 m² · 2024

Category

Office Fit-Out

Square meters

4,102 m²

Year

2024

Architect

Mussa Arquitectos

Gallery

Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 1/6
Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 2/6
Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 3/6
Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 4/6
Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 5/6
Office Fit-Out for Parque Arauco in Santiago — 4,102 m² — 6/6

Project summary

Parque Arauco Corporate Offices: Expansive Spaces, Two-Stage Design, and Distinctive Character

Completed in 2024 by Constructora Lago Riñihue, the new Parque Arauco offices represented a large-scale project covering a total area of 4,102 m²:

Architectural Design: The spatial design was undertaken by Mussa Arquitectos, combining expansive areas with a meticulous selection of materials, forms, and finishes to create a unique atmosphere with distinctive character.

Architectural and Structural Landmark (Curved Staircase and Wood Slats): The project incorporated a imposing staircase as its central element, connecting both floors. Structured in metal and surrounded by a complex system of wooden slats, this system had to trace and adjust millimetrically to the entire perimeter of the curved geometry.

Prominence of Biophilia: A strong biophilic concept was integrated throughout, incorporating natural elements and vegetation that humanise the interior space, enhancing the well-being and connection of employees with their work environment.

High-Precision Technical Challenge (Floor Flatness): As the primary underlying construction complexity, the enormous difficulty of achieving perfect flatness across surfaces had to be overcome. This was an indispensable requirement for the correct installation of large-format vinyl flooring, which creates a single, continuous surface throughout the space.

Two-Stage Execution: Construction was carried out in two distinct phases which, once unified and integrated, formed a continuous ensemble of remarkable spaciousness and spatial richness.

This significant project consolidates our capacity to execute large-scale corporate works with complex challenges, ranging from singular structures to fine finishes.